LIN Dual-Torch Linear Welding Machinery Series

  Previous

 Catalogue              Instruction

1.)Torch moving device install in the under the workpiece platform can avoid the collision and welding slag contamination.

2.)Torch travel speed : 200 - 2,000mm/min.

3.)The right and left sides are equipped with a torch adjusting device.

4.)Workpiece platform has three concave grooves,easy to install workpiece fixture.

5.)Start / Crater arc timer : 0 - 99.9sec.

6.)Operate two the air electromagnetic valve.

7.)The table speed has many kinds of choices,please consult the catalogue.

8.)Propose cooperating with welder 2 cycle / 4cycle start and welding manually.

9.)Use Explain

 Previous

  • Total visitors 161346